INJECTION MOLDING ENCYCLOPEDIA
Injection Molding Encyclopedia
Find hot runner articles by industry, material, and molding defect.
Frequently Asked Questions
Find products by material
View all four productsTotal 194 articles · Current:All industries
Browse by defect, material, and industry
194 articles
Black Spots in Wire-to-Board PA46 Parts Despite Adequate Melt Temperature
PA46 (Stanyl TS250F6D, 30% GF): Melting point 295°C, optimal melt 305–320°C, barrel/nozzle 305–320°C, shrinkage 0.4%/1.1%. Narrow processing windows make degradation sensitive to residence time; black spots correlate with machine uptime. Solutions include minimizing runner volume, using lower melt temps, and defining clear startup procedures.
Why LCP Still Warps in 0.2mm Wall Thickness FPC Connectors
LCP (Vectra E130i, 30% GF): Melt temp 335°C; hot runner 335–345°C; mold temp 80–120°C; shrinkage 0.10%/0.40%. For 0.2mm thin walls, use high injection speed with two-stage injection (fast then slow). Near 4:1 aspect ratios amplify anisotropy, causing warpage.
Cost Reduction with PA9T in FPC Connectors: Overcoming Thin-Wall Challenges
PA9T (Genestar G1350A, 35% GF): Melt temperature 300°C; barrel 280–340°C; nozzle 300–350°C. Water absorption: 0.19%; shrinkage: 0.3%/0.9%. Maximum flow length ratio for 2mm walls is 75. PA9T excels in flap toughness; body parts are typically LCP. Dual-material designs require tolerance analysis.
PPS in FPC Connectors: Stable Dimensions, but Flap Cover Cracking
PPS (DURAFIDE 1140A1, 40% GF): Mold temp 150°C, max material temp 360°C, nozzle 310–320°C, vent depth 0.005–0.008mm.. Higher mold temps aid 2mm thin-wall filling, but low elongation at break may cause cracking in flap hinges and clips. Consider using PA9T for the flap while retaining PPS for the body.
Is PA46 Flow Sufficient for 0.2mm FPC Connectors?
PA46 (Stanyl TS250F6D, 30% GF): Melting point 295°C; melt temperature must exceed 305°C, with an optimal range of 305–320°C. Shrinkage is 0.4%/1.1%. Flow fills 0.2mm thin walls, but the processing window is only 15°C. For small parts with large runners, extended residence time can cause degradation and black spots.
When to Use PEEK in FPC Connectors: Specific Scenarios
PEEK (Victrex 650G): Melting point 343°C, nozzle 395°C, barrel zones 375/380–385/390°C, mold temp 170–200°C, cylinder needs 400°C, drying 120–150°C × 3–5h. Typical use case: Long-term >180°C, 0.2mm thin walls, and strict dimensional stability—all three conditions required.
LCP Thick-Wall Challenges in Large Automotive High-Voltage Connectors
LCP (Vectra E130i, 30% GF): Melt temp 335°C; hot runner 335–345°C; mold temp 80–120°C; shrinkage 0.10%/0.40%. Center filling fails in 3–9 mm walls, leading to voids and sink marks. Use late gate freezing, higher mold temps, and insert preheating to resolve.
PA9T in HV Connectors: Moisture Absorption as an Electrical, Not Cosmetic, Issue
PA9T (Genestar G1350A, 35% GF): Water absorption 0.19% (ISO 62), drying 70–90°C × 4–8h, moisture ≤0.20%, barrel 280–340°C, nozzle 300–350°C. Moisture lowers volume resistivity; electrical acceptance for HV parts requires testing in both dry and humid/thermal states.
PPS Overmolding on Metal Inserts in HV Connectors: Causes of Interface Cracking
PPS (DURAFIDE 1140A1, 40% GF): Mold temperature 150°C, maximum material temperature 360°C, nozzle 310–320°C, vent depth 0.005–0.008mm.. Interface cracking results from CTE mismatch and uneven overmold thickness. Address insert fillets, preheating, and positioning accuracy together.
PA46 for HV Connectors: Why Long-Term Thermal Aging Fails Despite Short-Term Passes?
PA46 (Stanyl TS250F6D, 30% GF): Melting point 295°C, optimal melt temp 305–320°C, barrel/nozzle 305–320°C, shrinkage 0.4%/1.1%. High amide density accelerates thermal aging; long-term performance at 150°C depends on the grade's heat stabilization system, with thick walls adding residual stress.
Can't find the matching gate issue? Share material, part, and defect details. Our engineers will evaluate it by part.
Online selection and quote